This article belongs to the Classic Continuity |
Twin Mesa Nuclear Plant is a nuclear plant.
Appearance[]
Twin Mesa Nuclear Plant is a complex largely consisting of several gray buildings. It is situated in a clearing in a forest, and is aligned with a river. A bridge connects the power plant to the other side of the river, which leads to a road. Surrounding the majority of the plant is electrical cables. The most prominent structures on the site are two cooling towers, and a containment building for a nuclear reactor.
History[]
Alien Force[]
In If All Else Fails, when the Failsafe was activated, it began its task of absorbing energy in order to carry out its operation. Ben and the team entered the Failsafe to turn it off, but to achieve it, they had to remove Max, who acted as its brain. By doing that, they caused the Failsafe to almost crush a power plant which could explode if the Failsafe did not move. Fortunately, the Highbreed that activated it controlled it and at the same time destroyed itself along with it, thus saving most of the people who were kidnapped.
Appearances[]
Alien Force[]
Season 2[]
- If All Else Fails (first appearance)